The Governing Council, on a proposal from the Ministry of Water, Agriculture and Environment has authorized the hiring of the works of modernization of irrigation of the irrigable area of ​​sector 2, 'low Huerta' community of irrigators Pliego, with a budget of 9.07 million euros bidding.
It is planned multiannual funding, between 2016 and 2018, by 63 percent from the fund EAFRD, 11.10 percent to the Ministry of Agriculture, Food and Environment and 25.90 percent to the Community.
The aim of these works is to reduce losses of existing water and improve current conditions of service of irrigation water to all integrated in this sector plots in order to distribute the pressurized water to the irrigated area and allow remote and authorization.
The technical specifications include the incorporation of renewable energy, which should be fully integrated into the system of the community of irrigators, as the pressurized system projected in the irrigation network has over-pressures that allow energy use.
Recruitment will open procedure by various award criteria.
Source: CARM