The Minister of Agriculture and Water, Antonio Cerdá, today unveiled the refurbishment of the promenade of the ravines of Juncal and Mota, located in the town of Pliego, and visited the site sanitation center manifold.
The advisor, together with the mayor of Pliego, Isabel Toledo, said that the investment of these actions is 1.5 million euros.
The project of the Rambla del Juncal, located in the section Tosqueral-La Loma, has been the channeling of more than half a mile from the urban section.
In the case of the Barranco de La Mota, in addition to channeling the open, margins have been conditioned as it passes through the center of the city.
Cerda said the canal was built in a length of 272 meters "evacuate rainwater and prevent flooding which usually tend to occur during storms."
These actions will enable "keep clean the bed of the wadi", as stated by the adviser, who said that "recent rains in the town have to prove the efficiency of these infrastructures."
On the other hand, the head of regional government water works also visited the center manifold sewerage network and Conditions.
This infrastructure will have a length of 968 meters and a diameter of between 300 and 800 mm.
The works will allow the collection of rainwater and "avoid the problem of floods created serious inconvenience to citizens," said Cerda.
Source: CARM